53 photos
Key Specifications
Year
2021
Mileage
74,267 mi
Fuel Type
Electric
Transmission
Automatic
Body Type
hat
Colour
BLUE
Description
FINISHED IN A STUNNING NAVY BLUE WITH BLACK CLOTH SEATS COMPLEMENTED BY 17 INCH ALLOYS. COMING WITH SERVICE HISTORY AND ONLY 1 OWNER FROM NEW + VIRTUAL COCKPIT + SATELLITE NAVIGATION + 360 DEGREE CAMERA + REAR VIEW CAMERA + APPLE CAR PLAY + ANDROID AUTO + REAR PARKING SENSORS + CRUISE CONTROL + SPEED LIMITER + DRIVER MODES + LANE ASSIST + BLUETOOTH CONNECTIVITY + DAB RADIO + AM/FM RADIO + IN CAR ENTERTAINMENT: USB + MULTI FUNCTION FLAT BOTTOM STEERING WHEEL + PRIVACY GLASS + PUSH BUTTON START + CLIMATE CONTROL + AIR CONDITIONING + AUTOMATIC LIGHTS + AUTOMATIC WIPERS + ELECTRIC WINDOWS + ELECTRIC DOOR MIRRORS. ------------FINANCE------------ ***NOT SURE YOU'RE ELIGIBLE FOR CAR FINANCE? *** CHECK TODAY USING THE FREE CAR FINANCE CHECKER ON OUR WEBSITE.** Dace Motor Group have a dedicated team of finance experts waiting to help with your enquiry. Over the past 30 years we have forged relationships with the country's largest and best finance houses. We are specialists in Hire Purchase (HP), Personal Contract Purchase (PCP) as well as assisting those with poor credit or previous credit problems. ------------ABOUT US------------ - At Dace Motor Group, we are very proud to have been named the first Trading Standards Approved Car Retailer, with process and procedures developed with and applauded by them. We do recommend that customers RESERVE their choice of vehicle prior to making their trip to avoid potentially missing it. Visit our website https://www.dacecarsupermarket.co.uk/ At Dace Motor Group we carry over 700 cars in group stock. TO ENQUIRE OR RESERVE PLEASE CALL | 0161 477 7056 ------------WARRANTY------------ Unlike most car dealerships who provide limited cover warranties through an anonymous third-party provider, we provide our own unrivalled, nationwide cover on every car. So, when you need assistance the most, you will be helped by the staff who you already know. + 3 MONTHS WARRANTY FREE + EXTENDED WARRANTIES AVAILABLE + ------------ADVERT ACCURACY------------ Although we make effort to ensure the description of our vehicles is accurate, mistakes can happen. We are human after all! So, whether it is the exact specification of a vehicle you need clarifying, the service history dates and mileages, even the colour shade u2013 please speak to a member of our sales team and they will happily confirm all you need to know about this car. PLEASE NOTE u2013 our adverts can never be cited as the reason you have brought a car incorrectly, as no purchase can be completed without the customer physically examining the car. As such, the physical viewing and documentation provided for the vehicle is deemed to be the basis for the sale, not an advertisement that may on occasion contain an error. Visit our website https://www.dacecarsupermarket.co.uk/ At Dace Car Supermarket we carry over 700 cars in group stock. Many have Full Service History, Automatic or Manual and Models like CDTi, ecoFLEX, SE, Design, SXi, Active, Energy, Sport, SRi, GLS, CDTi, Turbo, GTC, Black Edition, VXR some of our cars will have Sunroof, Panoramic Roof, Heads-Up Display, Heated seats, Heated Steering Wheel, Satellite Navigation, 360 Camera, Apple Car Play, Android Auto, Premium Sound System, Wireless Phone Charging, Full Leather, Adaptive Cruise Control, Dual Climate Control, and Bluetooth.
Standard Features
12V Electrical Accessory Socket
17in Alloy Wheels - Bi-Colour
7in Digital Instrument Cluster
ABS - Anti-Lock Braking System
Airbag - Drivers
Airbags - Front Passenger
Airbags - Front Seat Side-Impact
Airbags - Full Size Curtain
Automatic Anti-Dazzle Rear-View Mirror
Automatic Emergency City Braking
Automatic Lighting Control
Black Lower Side Window Mouldings
Black Roof and A-Pillars
Body Coloured Front and Rear Bumpers
Bonnet - Headlight - Wiper Structure
Cabin Particulate Filter
Central Facia Display
Centre Rear Brake Light
Child Proof Locks on Rear Doors
Chrome Logo Bar
Comfort Front Seats
Cruise Control with Intelligent Speed Limiter
Dark Tinted Rear Side and Tailgate Windows
Deactivation Switch for Front Passengers Airbag
Door Handles - Body Coloured
Door Handles - Interior - Chrome Effect
Door Mirrors - Electrically Adjustable-Heated
Drive Mode Selector - Sport-Normal-Eco
Driver Drowsiness System
Driver Information Display
Drivers Seat 6-Way Adjustable
Drivers and Front Passengers Sunvisor Incorporating Vanity Mirrors with Covers
EBD - Electronic Brakeforce Distribution
EPB - Electric Parking Brake
ESP - Electronic Stability Programme
Electrically Operated Front and Rear Windows with Safety Autoreverse and One-Touch Facility
Electronic Climate Control
Electronic Engine Deadlock Immobiliser
Emergency Brake Assist
Forward Collision Alert
Four Adjustable Facia Vents
Four-Speed Fan with Illuminated Controls
Front Camera System
Front Passengers Seat - Four-Way Adjustable
Fuel Gauge with Low Fuel Level Warning Light
Glazed Tailgate with Heated Window and Wash-Wipe Facility
Hazard Warning Lights
Head Restraints - Height Adjustable
Headlight Levelling System
High Gloss Black B-Pillars
Hill Start Assist
ISOFIX Child Seat Mountings Incorporating Top Tether Anchor Points Located on Outer Rear Seats
Illuminated Glovebox with Lid
Inertia-Reel Lap and Diagonal Seatbelts
Interior Courtesy Lights and Front Map Reading Light
Jet Black Door Panels
Keyless Start
LED Ambient Lighting
LED Daytime Running Lights
LED Front Fog Lights
LED Headlights with High Beam Assist
Lane Departure Warning with Lane Assist
Lights On Audible Warning
Lockable Fuel Filler Cap
Luggage Compartment Lighting
Mistral Facia
Mode 3 - 3-Phase 22kW Cable
Multi-Function Trip Computer
Multimedia Navi System
Panoramic Rear View Camera
Rain Sensitive Windscreen Wipers
Rear Fog Light
Rear Parking Distance Sensors
Rear Reversing Light
Remote Control Central Door Locking
Remote Control Security Alarm System
Seatbelt Unfastened Audible Warning and Warning Light
Seats - 60-40 Split Folding Rear Seats
Seats - Heated Front
Solar Heat Absorbing Windscreen
Speed Sensitive Power Assisted Steering
Speed Sign Recognition
Speedometer and Rev Counter
Steering Column - Adjustable for Reach and Rake
Steering Column Lock
Steering Column Mounted Audio - Phone - Cruise Controls
Steering Wheel - Heated
Steering Wheel - Three-Spoke Design - Leather Covered Flat Bottom - Satin Chrome-Effect Bezel
TPMS - Tyre Pressure Monitoring System
Trip Computer
Two Keys - One Folding with Integral Remote
Two-Litre Open Door Pockets
Two-Speed Windscreen Wipers
Upper and Lower Bumper Design
Vauxhall Connect
Water Temperature Gauge with Warning Light
Windscreen and Side-Window Demist Vents
All Images (53)
1/53
Similar Cars
£8,340
2021 Vauxhall Corsa Electric
50kWh Elite Nav Premium Hatchback 5dr Electric Auto (7.4Kw Charger) (136 ps) VIRTUAL COCKPIT + HALF LEATHER
75,599 mi
Electric
View Details
£8,870
2022 Vauxhall Corsa Electric
50kWh SRi Premium Hatchback 5dr Electric Auto (136 ps) VIRTUAL COCKPIT +CRUISE +17" ALLOYS
59,992 mi
Electric
View Details
£7,690
2021 Vauxhall Corsa Electric
50kWh Griffin Hatchback 5dr Electric Auto (7.4Kw Charger) (136 ps) VIRTUAL COCKPIT + CARPLAY + CRUISE
£8,290
Dealer Information
Dace Motor Company
Greg Street, Reddish, Stockport, SK5 7BS
0161 477 7056 Dealer's Autotrader Page Forward Finance